Sunday 9 October 2011

'Gert's Bucket' Poltergeist

The shoot got cancelled again on the 1st Oct so we rescheduled for today. With the weather not looking so good, we took advantage of a break in the rain to film the outside 'introduction shot'. We then shot 2 scenes inside the caravan as it peed it down outside. After lunch the weather wasn't any better but we made a decision to soldier on and finish the shoot. The caravan eventually went up in the end (after a bit of persuasion to get it going) and overall we were pleased with the days work.
Big thanks to Liam, John, Trevor, Tom and Horris all from the Co-op, Alan and Darren who acted in the film (even though they're not actors)  and a very big thanks to the owners of the farm who helped in the production and put on a very welcome spread.
Time to relax now and think about the 4th episode and then L&S 2.